
Three modeled planning scenarios show how to move from a measured area to a material list. They are examples, not reports of completed field projects.
Example: a 200 sq ft patio with a 6 in compacted base needs 3.70 compacted cubic yards of base before converting to loose delivered material; paver count, bedding, edging, and joint sand require their own specifications.
Project plans


