By YardHatch · Updated
A water budget estimates a volume over a period; a schedule decides when and how to deliver it. EPA says its Water Budget Tool is not an irrigation scheduler.

How to plan it
- Choose an area and period for the budget
- Use local climate and plant data to refine demand
- Use weather and field observations to set actual run times
A practical planning example
For illustration, 100 gallons delivered at a measured 5 gallons per minute takes 20 minutes. At 2.5 gallons per minute it takes 40 minutes. Neither figure tells you when plants need water or whether the soil can absorb it without runoff. Check actual system output, rainfall and moisture before translating a budget into operating times.
Examples explain the decision or calculation. Assumed quantities and rates are not installation specifications.
Turn this into a quantity
Record your site measurements first. Then use a calculator with the depth, application rate, or coverage from the actual material specification.
Open landscape water budgetSource and limits
US EPA WaterSense: Water Budget Tool. Local conditions and manufacturer guidance may call for different materials or installation details.