Compare the full order for the same material specification. All calculations run in this browser.
Method and assumptions
Order units = required yards ÷ yards per selling unit, raised to the minimum load, then rounded up to the order increment. Total = material + delivery + extras + entered tax. Cost per needed yard includes the cost of surplus. Do not compare different products as interchangeable.
Worked example: 2 yd³ with 0.5 yd³ increments at 40 per yard and 30 delivery totals 110 before tax. A minimum of 3 yd³ raises that total to 150.
Read the bulk versus bags comparison